Carusoon World Tour

Demo

Prototype with made-up posts and route

· Split, Croatia · clear sky, 24 °C, 2 kn wind

We let go of the lines

At seven in the morning we were still standing on the quay with a mug of coffee each, and nobody said out loud that this was it, we were really leaving. Then the harbour master waved, the engine coughed into life, and the towers of Split slowly shrank behind us.

This is the first post. This is where I’ll write down whatever happens: the good, the bad, and also the days when only the wind blows and nothing else happens at all.

(Dummy text for the prototype.)

Machine translation (AI, Claude) of Balázs’s Hungarian original. Read the original →

· Palma de Mallorca · light showers, 26 °C, 7 kn wind

Twelve days on the Mediterranean

Instead of the Strait of Messina we came round south of Sicily, and that was a good call: for two days the wind blew so steadily that we hardly had to touch the helm.

Off the southern tip of Sardinia, though, a night-time thunderstorm caught us. By morning everything was wet, but the boat took it well. We, less so.

(Dummy text for the prototype.)

Machine translation (AI, Claude) of Balázs’s Hungarian original. Read the original →

· Gibraltar · partly cloudy, 21 °C, 11 kn wind

At the gate of the Strait

The Strait of Gibraltar shows no mercy to anyone who turns up in the wrong weather. We went through the tide tables three times, and still ended up waiting an hour with the wind on the nose.

The Rock is home to monkeys who know exactly which tourist has a sandwich. We didn’t have one, so they lost interest in us pretty quickly.

(Dummy text for the prototype.)

Machine translation (AI, Claude) of Balázs’s Hungarian original. Read the original →

· Las Palmas, Canary Islands · partly cloudy, 24 °C, 4 kn wind

Before the ocean

In Las Palmas every boat is getting ready for the same thing: the crossing. Everyone on the pontoons is lugging water, diesel and bananas, and everyone asks everyone else when they’re leaving.

We stocked up for roughly a month and replaced the generator belt, which had been squeaking ever since Gibraltar.

(Dummy text for the prototype.)

Machine translation (AI, Claude) of Balázs’s Hungarian original. Read the original →

November 2026 · 6 posts – loading…